最新消息
停水電空調
- 發布日期:114-05-13
- 更新日期:114-05-13
- 發布單位:營繕二組
114年度暑期高壓設備停電檢查保養 時間調查[第二版]
公 告
114年度暑期高壓設備停電檢查保養
時間調查[第二版]
(光復校區、博愛校區及客家學院)
今年度保養時間預計為6月14日開始至8月底結束,館舍停電檢查時間詳如附件,如有需調整請於114年5月15日前由「館舍管理人員」協調後統一回覆光復校區營繕二組(戴小姐#31406),以利同一棟須調整時段協調確認完成。
【Announcement】
The high-voltage equipment power failure inspection and maintenance at NYCU during Summer Vacation, 2025
Announcement of Tentative Schedule(2th Announcement)
( Guangfu Campus, Boai Campus, and Liujia Campus)
This year's maintenance period is expected to start from June 14, 2025 to the end of August. Please refer to the attachment for details of the power outage inspection time of the building.If there is a need to change the maintenance period, please contact the respective building management personnel before May 15, 2025. Then, the management personnel should coordinate and provide a unified response to 2nd Division of Construction and Maintenance on the Guangfu Campus(Miss Tai #31406).
時間調查[第二版]
(光復校區、博愛校區及客家學院)
今年度保養時間預計為6月14日開始至8月底結束,館舍停電檢查時間詳如附件,如有需調整請於114年5月15日前由「館舍管理人員」協調後統一回覆光復校區營繕二組(戴小姐#31406),以利同一棟須調整時段協調確認完成。
【Announcement】
The high-voltage equipment power failure inspection and maintenance at NYCU during Summer Vacation, 2025
Announcement of Tentative Schedule(2th Announcement)
( Guangfu Campus, Boai Campus, and Liujia Campus)
This year's maintenance period is expected to start from June 14, 2025 to the end of August. Please refer to the attachment for details of the power outage inspection time of the building.If there is a need to change the maintenance period, please contact the respective building management personnel before May 15, 2025. Then, the management personnel should coordinate and provide a unified response to 2nd Division of Construction and Maintenance on the Guangfu Campus(Miss Tai #31406).
相關附件:
- 聯絡人: [ 戴雪蘭 ] / [ 劉光庭 ]