Link to Content Area

NYCU Office of General Affairs

News

  • Others

  • Update Date:2025-01-20
  • Units:The 1st Division of Construction and Maintenance
Power Outage Notice(114-Year Campus Substation Power Equipment Renewal Project)
project name:114-Year Campus Substation Power Equipment Renewal Project
illustrate:
1. Power Outage Date: April 2, 114 (Wednesday) from 08:00 to 24:00.
2. Power Outage Scope: Main Campus Area (excluding the Library and Information Building, Shouren Building, Biomedical Building, Traditional Building A, Shanlu Village, and Male and Female Dormitories 5.
3. Please note that during the power outage, emergency power will only be provided to the following buildings: Experimental Building, Biomedical Engineering Building, Animal Center, Dental Building, Medical Building II, Nursing Building, Medical Building, Administrative Building, and Teaching Building. To ensure necessary equipment receives emergency power supply, general electrical devices should not use the emergency power supply to avoid overloading and tripping the emergency power, which may affect those who truly need it.
4. Relevant departments, such as Management Group 1, Affairs Group 1, and Accommodation Services Group, are requested to strengthen internal business promotion: It is recommended that each user unit assign personnel to stay behind to check the status of electrical devices such as refrigerators or experimental instruments, and to confirm whether the power supply is normal upon restoration.
5. Please have each unit pay attention to whether important equipment is connected to the emergency power supply before April 2, and prepare supporting measures in advance. If assistance is needed, please contact Mr. Li from the Construction Group at extension 62068 or via email at [email protected]
6. For important experiments or business activities, please try to avoid the aforementioned time period to prevent affecting significant outcomes. Please do not use the elevator before the power outage to avoid any inconvenience, and we appreciate your understanding.
Business unit:1st Division of Construction and Maintenance   Mr. Li #62068 
Related Image(s):
gotop