進入內容區塊

國立陽明交通大學總務處

最新消息

  • 其他

  • 發布日期:113-06-04
  • 更新日期:113-06-04
  • 發布單位:營繕二組
113年度暑期高壓設備停電檢查保養
公 告
113年度暑期高壓設備停電檢查保養
(光復校區、博愛校區及客家學院)
今年度保養時間預計為7月6日開始至9月1日結束,館舍停電檢查時間詳如附件,煩請本校師生同仁務必注意該棟館舍高壓設備停電檢查保養時間。

 
【Announcement】
The high-voltage equipment power failure inspection and maintenance at NYCU during Summer Vacation, 2024
( Guangfu Campus, Boai Campus and Liujia Campus)
This year's maintenance period is expected to start from July 6th to September 1. Please refer to the attachment for details of the power outage inspection time of the building. Please pay attention to the power outage inspection and maintenance time of the high-voltage equipment in the building.
  • 聯絡人: [ 戴雪蘭 ]
gotop