最新消息
校園規劃與工程
- 發布日期:113-07-15
- 更新日期:113-07-16
- 發布單位:事務一組
主旨:本校陽明校區配合「陽明校區山坡地整治工程」,環山停車區進行管制,詳如說明。
二、管制內容:
(二) 旁4格汽車停車格,暫時停止停放車輛。
(二) 總務處事務一組:林先生,分機62214
Subject: Restricted Access to the Huanshan Parking Area for the "Yangming Campus Slope Stabilization Project"
Details:
1. Restricted Area: The second motorcycle parking shed and the four adjacent car parking spaces in the Huanshan area.
2. Access Control Measures:
(1) The original front entrance will be closed. Access will be through the rear entrance (one section of the U-shaped barrier will be temporarily removed to create a temporary entrance).
(2) The four adjacent car parking spaces will be temporarily unavailable.
3. Control Period: From July 15, 2024, to October 20, 2024 (tentative).
4. Cooperation Request: Drivers needing to park vehicles are requested to comply with these measures. We apologize for any inconvenience caused. For any questions, please contact:
(1) Mr. Hou, 1st Division of Construction and Maintenance, ext. 62070
(2) Mr. Lin, 1st Division of General Affairs, ext. 62214
- 聯絡人: [ 林睿澤 ym.josh123@nycu.edu.tw 62214]