最新消息
停水電空調
- 發布日期:114-05-26
- 更新日期:114-05-26
- 發布單位:營繕二組
114年度暑期高壓設備停電檢查保養
公 告
114年度暑期高壓設備停電檢查保養
(光復校區、博愛校區及客家學院)
今年度保養時間預計為6月14日開始至8月底結束,館舍停電檢查時間詳如附件,煩請本校師生同仁務必注意該棟館舍高壓設備停電檢查保養時間。
【Announcement】
The high-voltage equipment power failure inspection and maintenance at NYCU during Summer Vacation, 2025
( Guangfu Campus, Boai Campus, and Liujia Campus)
This year's maintenance period is expected to start from June 14th to August 30th. Please refer to the attachment for details of the power outage inspection time of the building. Please pay attention to the power outage inspection and maintenance time of the high-voltage equipment in the building.
114年度暑期高壓設備停電檢查保養
(光復校區、博愛校區及客家學院)
今年度保養時間預計為6月14日開始至8月底結束,館舍停電檢查時間詳如附件,煩請本校師生同仁務必注意該棟館舍高壓設備停電檢查保養時間。
【Announcement】
The high-voltage equipment power failure inspection and maintenance at NYCU during Summer Vacation, 2025
( Guangfu Campus, Boai Campus, and Liujia Campus)
This year's maintenance period is expected to start from June 14th to August 30th. Please refer to the attachment for details of the power outage inspection time of the building. Please pay attention to the power outage inspection and maintenance time of the high-voltage equipment in the building.
相關附件:
- 聯絡人: [ 戴雪蘭 ] / [ 劉光庭 ]